Statistical Methods For Mineral - Engineers

Elara didn't argue. She pulled out a run chart—a simple time-series plot of the crusher’s closed-side setting (CSS). “See these oscillations? Every time you adjust the CSS manually, you overcorrect. The moving range between samples is 4 millimeters. Your control limit for natural variation should be 2 millimeters. You’re introducing special cause variation.”

Gus blinked. “Speak English.”

The mine manager’s next text was less congratulatory and more confused. “Why did our instantaneous rate drop but our total tonnage increase?” Statistical Methods For Mineral Engineers

Dr. Elara Vance stared at the raw tonnage report from the new crushing circuit. The number was good—really good. Throughput was up 12% from last quarter. Her phone buzzed with a congratulatory text from the mine manager. Elara didn't argue